Fence Calculator
Written byOleh Soloninupdated
A straight run has one more post than bays; a fence closed around a plot has as many posts as bays.
Depends on the soil and the frost line; 0.9 m is an example, not a rule.
The bored diameter: the concrete per post follows from it.
Result
- Posts25
- Bays24
- Post length, m2.9
- Rails, m120
- Sheets55
- Concrete for posts, m³1.1
- How it was calculated
60 m ÷ 2.5 m = 24 spans, one more post than spans — 25 post length: 2 m above ground + 0.9 m embedded = 2.9 m hole: π × (0.25 ÷ 2)² × 0.9 = 0.044 m³ per post, 1.1 m³ in total
Related tools
Concrete Calculator
Concrete volume for a slab, strip footing or piles, broken down into cement, sand, gravel and water by the parts and density you set.
Lumber Calculator
Timber volume in cubic metres, how many boards fit in a cube, total area covered, mass and cost.
Square Footage Calculator
Area of a rectangle, triangle or circle given straight away in square metres, square feet, square yards, hectares and acres.